Move or resize scheduling components

You can change the duration and time frame of components by moving or resizing them. You can either use the details pane or the dialog windows to make these changes, or you can use the mouse to make these updates.

Moving moves the entire component to a different time frame during the selected day. Resizing shortens or lengthens the time frame by changing the start or end time.

Before you begin 

Select campaign data for schedules or Select no campaign for schedules

Procedure 

  1. From the calendar, select the shift Work period in WFM that has a definite length. or event that you want to move or resize.

  2. Do one of the following:

  3. To verify that the moving or resizing was updated, do one or both of the following:

    • Point to the component on the calendar and verify that the duration and time frame have changed according to your update.

    • Select the component and view the update on the details pane.

Edit a shift assignment

Edit a shift event