Lock or unlock multiple components
You can bulk lock or unlock multiple components simultaneously. You can lock or unlock shifts, shift Work period in WFM that has a definite length. events, floating calendar events and class sessions, and project events for a specific time period.
Locking assignments is useful when you do not want to move the events when you reschedule. To give the scheduling engine the flexibility of moving events, unlock them.
Bulk Lock / Unlock Employees and Poolers, not Phantoms
You can only bulk lock or unlock employee or pooler schedules, and not phantoms. Therefore, from the Employees filter, if you select Phantoms (with or without selecting Employees or Poolers), the Bulk Lock / Unlock menu option is not available.
Procedure
-
From Home, select Bulk Lock/Unlock.
-
From Dates, select the date range for which you want to lock or unlock scheduling components.
-
From Components, select the components you want to lock or unlock (including shifts, shift events, floating calendar events or project events).
-
Do one of the following:
-
To lock the selected components, select Lock.
-
To unlock the selected components, select Unlock.
-